In October 2026, Duoson Multimédia supported Global Affairs Canada at the 2026 Canada-EU Summit in Montréal. The Prime Minister of Canada, the President of the European Council and the President of the European Commission met at the Grand Quai du Port de Montréal, along with ministers, delegations and accredited international media. Over three days, our team delivered four spaces across the Grand Quai’s tower and pavilion. Each space had its own technical brief, and all of it had to work flawlessly on a single show day.

The 13th floor: a room where nothing could look out of place

The Expanded Meeting Room on the 13th floor was the centrepiece. We installed 32 Bosch Dicentis conference microphones around the table, 16 per side, and fed them to the press through a dedicated media rack. We also flew four line-array speakers from the room’s exposed steel beam. The standard we set for this room was simple: nothing visible that didn’t need to be. Everything we hung, along with every cable, tie and strip of tape, was white, so it disappeared into the ceiling and the beams. Before we arrived, every cable run was mapped on a cabling plan that avoided marked “no-cable” zones, running up the west wall and through the ceiling. We kept the staircase to the observatory and glass floor completely clear, because dignitaries would be walking and waiting there. The result was a room that looked built for the occasion, not rigged for it.

Black cables dressed along the base of a glass wall overlooking Montréal's Old Port
Floor runs dressed tight to the window frame, out of sight lines.

The bigger challenge was daylight. In planning, we mapped the sun’s path across the room for the exact date and time of the meeting. We built renderings to see how that light would fall on the delegates’ faces on camera, and they showed the south windows taking direct sun for the entire meeting. Based on that, we decided to apply neutral-density film to the windows. On site, we balanced the table lighting with a light meter, so every face read evenly for broadcast and photography from start to finish.

3D render of the meeting room with stylized delegates, seen from the camera position
Pre-production render from the media position.
Long conference table with Bosch Dicentis microphones, name cards and flowers, in front of downtown Montréal
Show day: the table set for the Expanded Meeting.

The 10th floor: the leaders’ tête-à-tête

The trilateral meeting between the three leaders came with its own window and lighting challenges. We lit it for broadcast and still photography.

LED panels on stands aimed at the tête-à-tête set and its armchairs
Bi-colour LED panels lighting the tête-à-tête set.
Tête-à-tête set with three armchairs, flags and the Summit backdrop
The tête-à-tête set, lit and ready.
The three leaders standing on the tête-à-tête set
The three leaders on set.

The press conference and delegation area

In the pavilion’s press conference room, we delivered full English–French simultaneous interpretation. That included the interpreter booth with a standby backup booth, interpretation at all three podiums, 200 wireless receivers for media and guests, and clean language feeds to the press. In the delegation area, we built private delegate rooms, bilateral meeting rooms and a lounge entirely out of pipe and drape, run as high as possible for sound privacy, and we supplied power for catering.

Red-carpet walkway lined with grey drape and Canadian and European Union flags
The leaders’ arrival walk, lined in grey drape.
The three leaders at their podiums on the red-carpet stage, in front of the Summit backdrop and the audience
The joint press conference.

Working inside a secure perimeter

The site was under RCMP control, with security sweeps, delegates-only zones and tight access windows. We planned accordingly. The tower rooms were delivered and built on day one, the pavilion on day two, and every road case was moved to pavilion storage before show day so the event spaces stayed clean. Before the crew arrived, they received detailed show notes with sun studies, cabling plans and drape plans traced onto the venue’s own drawings, so everyone knew exactly where each case went. On strike, the press area stayed untouched until the media had filed.

High-security, high-visibility events leave no room for improvisation. This one went exactly as planned.